Costa Concordia P2 Port Sponson Installation Underway

p2

The sponson has been lifted off through the Conquest crane and is now being submerged.

In the next hours it will be connected to the wreck. Following this installation, technicians will progress with the last of the 30 sponsons, P1.

In the refloating phase, sponsons will be gradually emptied of ballast water through compressed air systems, allowing the wreck to refloat.

Press Release, July 01, 2014

 

Share this article

Follow Subsea World News

Events>

<< Jun 2016 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

Subsea Forum Rio 2016

Offshore production outlook in the oil and gas global industry has undergone major changes, mainly driven by the fall in oil prices,…

read more >

APPEA 2016

200 exhibiting companies and exhibitions are expected to showcase their products and services at APPEA 2016. These will include representatives from:…

read more >

OPEX Global Subsea Power Cables Forum for the O&G and Energy Industry 2016

This year subsea power cable forum will bring together key experts from Oil and Gas and Energy Industry globally to discuss the current…

read more >

Offshore Philippines 2016

The 3rd edition of MARINE PHILIPPINES 2016, SHIPBUILD PHILIPPINES 2016 and OFFSHORE PHILIPPINES 2016 isthe only specialized Shipbuilding…

read more >