‘Willendeavour’ Conducts Geotechnical Survey on Burbo Bank 2 OWF

'Willendeavour' Conducts Geotechnical Survey on Burbo Bank 2 OWF

A geotechnical ground investigation at the proposed Burbo Bank 2 (extension) wind farm has started on Friday, 4th July, and is expected to run until mid-august, dependant on weather and conditions.

This geotechnical investigation will consist of a series of shallow vibrocore holes and cone penetration tests (cpts) at selected positions in the proposed wind farm footprint as well as along the proposed export cable route and will be carried out by the 22meter multi cat ‘Willendeavour’

The survey is not expected to interfere with any other vessels but a wide berth, minimum 500 meters,is requested around ‘Willendeavour’ at all times whenever this vessel is on site as the vessel will be required to remain stationary for long periods while sampling.

Press Release, July 09, 2014; Image: williams-shipping

Share this article

Follow Subsea World News

Events>

<< Apr 2015 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

OMC 2015

OMC 2013 reached over 13,700 participants, an increase of 31% compared to 2011, from 32 countries worldwide, a sign that both the conference…

read more >

Transnational Oil, Gas and Energy Law

Study a Unique Online Learning Programme that is Highly Relevant to Today’s International Market…

read more >

Heavy Transport & Lifting for Oil, Gas and Marine by Richard Krabbendam

Building a lift plan
Choosing the right crane
Using a tail crane
Selecting the right platform trailer or SPMT
Estimating forces in lifting…

read more >

MCE Deepwater Development 2015

Marine, Construction & Engineering (MCE) Deepwater Development is recognized as the leading conference addressing technical issues related…

read more >