CNOOC Announces Production Start from Panyu 10-2/5/8 Project

CNOOC Announces Production Start from Panyu 10-258 Project

CNOOC Limited announced that its Panyu 10-2/5/8 project has commenced production.

The slow dragging of Panyu 10-2 module by hoist.

Panyu 10-2/5/8 project is located in the Pearl River Mouth Basin of the South China Sea with an average water depth of approximately 100 meters. This project includes 3 oilfields, Panyu 10-2, Panyu 10-5 and Panyu 10-8 and was designed to share some facilities of Panyu 4-2 oilfield.

The main newly-built production facilities include 1 wellhead platform and 9 producing wells. Currently there are 4 wells producing approximately 9,000 barrels per day, and the project is expected to hit its peak production of approximately 13,000 barrels per day in 2015.

Panyu 10-2/5/8 is an independent project in which the Company holds 100% interest.

Press Release, July 31, 2014

Share this article

Follow Subsea World News

Events>

<< Mar 2015 >>
MTWTFSS
23 24 25 26 27 28 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

OMC 2015

OMC 2013 reached over 13,700 participants, an increase of 31% compared to 2011, from 32 countries worldwide, a sign that both the conference…

read more >

Transnational Oil, Gas and Energy Law

Study a Unique Online Learning Programme that is Highly Relevant to Today’s International Market…

read more >

Heavy Transport & Lifting for Oil, Gas and Marine by Richard Krabbendam

Building a lift plan
Choosing the right crane
Using a tail crane
Selecting the right platform trailer or SPMT
Estimating forces in lifting…

read more >

MCE Deepwater Development 2015

Marine, Construction & Engineering (MCE) Deepwater Development is recognized as the leading conference addressing technical issues related…

read more >