Pharos Subsea Hydraulic Cable Grab Helps Repair Basslink

Pharos Subsea Hydraulic Cable Grab Helps Repair Basslink

After completing London Array work, Pharos Offshore has secured a new job for its subsea hydraulic cable grab in Bass Strait off the Tasmanian coastline.

The subsea hydraulic cable grab will be used to recover the Basslink subsea cable for repair. The cable experienced fault in December last year.

The Basslink, connecting George Town in Tasmania and Loy Yang in Victoria, has a possible fault with the cable which is located approximately 100km off the Tasmanian coastline.

According to Pharos, the system was prepared and shipped within two days to the customer.

Earlier this month, Tasmanian Government informed about additional 30-day outage caused by the fault in Basslink. The Government said the outage will not have any impact on the power prices.

Subsea World News Staff

Share this article

Follow Subsea World News

Events>

<< Aug 2016 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 1 2 3 4

OSV CHARTERING CONTRACT MANAGEMENT SEMINAR

New revised agenda for 2016, including the following topics:
What happens if hire remains unpaid?…

read more >

12th Annual Deepwater Intervention Forum

The 12th Annual Deepwater Intervention Forum presented a first-hand look at emerging and proven technologies which offered real-world…

read more >

ONS 2016

The ONS Conference is known as one of the world’s most important oil, gas and energy fora, giving the delegates a sneak peek into the future…

read more >

SMM 2016

SMM Hamburg 2016 is the leading international forum of the maritime industry.SMM offers the unique chance for exhibitors and trade visitors…

read more >