Seaproof Solutions’ Cable Protection for TWB-II Wind Farm

Seaproof Solutions has received a contract to supply its ‘Long cable protection systems (CPS)’ for the Trianel Windpark Borkum Phase II (TWB-II) offshore wind farm.

The contract was awarded by Siem Offshore Contractors and covers the design and supply of cable protection systems for the inner array grid submarine cables.

The TWB-II offshore wind farm is located approximately 40 km north of the island of Borkum in the German Bight.

Seaproof Solutions’ head office and main production site in Bergen, Norway will execute the contract, with manufacturing expected to be completed in 2017 for offshore installation in 2018.

Henrik Bang-Andreasen, CEO at Seaproof Solutions said: “We, at Seaproof Solutions, are proud and very pleased that Siem Offshore Contractors chose our system and trusted our Seaproof Solutions cable protection system to benefit their project. ”

Share this article

Follow Subsea World News

Events>

<< Aug 2017 >>
MTWTFSS
31 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3

Subsea Expo 2018

The largest wholly-focused subsea event in Europe, Subsea Expo is organised by industry body Subsea UK…

read more >

8th Myanmar Oil, Gas & Power Summit

The Myanmar Oil and Gas Summit is the longest established Oil & Gas event in Myanmar. Every year the event is attended by government…

read more >

European Gas Conference 2018

The European Gas Conference celebrated its tenth anniversary amid an air of increasing optimism following considerably shifting markets in the last few years…

read more >

SPE/IADC Middle East Drilling Technology Conference and Exhibition

The theme for this conference is “Building on Today’s Efficiencies for Tomorrow’s Market.” This will be the basis for the technical agenda…

read more >