PSA Audits Concrete Coating on Polarled Pipeline
The Petroleum Safety Authority Norway (PSA) conducted an audit of the application of concrete coating on the ...
read more →Osiris Passes FPAL Checkup
Osiris has successfully completed benchmarking audit with Achilles FPAL, which will see them included on their ...
read more →PSA: Improvement Needed on COSLPromoter Rig
Between 24 June and 3 July 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of COSL Drilling ...
read more →PSA Carries Out Audit of Aasta Hansteen Facility
In June, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s engineering of the ...
read more →PSA Conducts Audit of Statoil’s Barrier ...
On 20 and 21 May 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s barrier ...
read more →PSA Conducts Ivar Aasen Load-Bearing Audit
From 23 to 25 April 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Det norske’s ...
read more →PSA Carries Out Audit of Faroe Development Licences
The Petroleum Safety Authority Norway (PSA) has carried out an audit of Faroe Petroleum AS (Faroe) as a licensee in ...
read more →PSA Conducts Polarled Detailed Engineering Audit
The Petroleum Safety Authority Norway (PSA) carried out an audit of detailed engineering of the Polarled pipeline ...
read more →PSA Carries Out Audit of Statoil’s Aasta Hansteen
In the beginning of April, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s ...
read more →PSA Carries Out Audit of Marathon Oil’s Bøyla Project
On 13 February 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of the Bøyla project. The ...
read more →NSOAF Completes Audit of Human and Organisational ...
The North Sea Offshore Authorities Forum (NSOAF), has recently completed a multi-national audit looking at how ...
read more →PSA Conducts Audit of Subsea Compression at Åsgard
On 3 October 2013, the PSA conducted an audit of the Åsgard subsea compression project at Statoil in Stavanger. The ...
read more →PSA Carries Out Audit of Det norske’s Ivar Aasen ...
On 17-18 June 2013, the Petroleum Safety Authority Norway (PSA) carried out an audit of the project management and ...
read more →PSA Carries Out Audit of Skarv FPSO
From 1 to 4 July 2013, the Petroleum Safety Authority Norway (PSA) carried out an audit of emergency preparedness ...
read more →PSA Carries Out Audit of Ekofisk 2/4 Z
On 7 June 2013, the Petroleum Safety Authority Norway (PSA) carried out an audit of emergency preparedness and ...
read more →PSA Carries Out Audit on Ekofisk Off Norway
An audit of ConocoPhillips Skandinavia AS (ConocoPhillips)’s new wellhead platform, 2/4 Z, on Ekofisk was ...
read more →PSA Conducts Audit of Teekay Petrojarl Knarr FPSO
From 20 March – 11 April 2013, the Petroleum Safety Authority Norway (PSA) carried out an audit of Teekay Petrojarl ...
read more →PSA Carries Out Audit of Ekofisk 2/4-C, Norway
The Petroleum Safety Authority Norway (PSA) carried out an audit of Ekofisk 2/4-C and ConocoPhillips between 5 ...
read more →PSA Carries Out Audit of Statoil Development and ...
The Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil Development and Production Norway’s ...
read more →PSA Carries Out Audit of Statoil’s Skrugard Development ...
On 3 and 4 April 2013, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s work to ...
read more →PSA Carries Out Audit of Operations Preparations for ...
During the period 11 – 13 March 2013, the Petroleum Safety Authority Norway (PSA) carried out an audit of Eni Norge ...
read more →