From 23 to 25 April 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Det norske’s follow-up of the Ivar Aasen project.
The objective was to verify that engineering of the load-bearing structures was in compliance with applicable regulations.
Result
No non-conformities were identified.
Improvement points were identified in connection with:
- Redundancy controls;
- Documentation;
- Non-conformity handling;
- Fatigue classification of jacket elements.