CONQUEST MB1 to Install Sponsons for Costa Concordia Parbuckling

DSC03695

A new sophisticated crane barge has arrived at Giglio Island in order to carry out operations related to the installation of the 19 sponsons to be completed before Costa Concordia refloating.

The CONQUEST MB1 is an offshore crane barge fitted with a sophisticated rotating/luffing crane and associated automated heel/trim compensation system.

The barge is designed on a modular concept, fitted with operational 6 point mooring system and accommodation modules suitable for 60 persons.

Furthermore a full air-range diving spread has been arranged on board and the diver teams involved in the installation of the sponsons will operate from the barge.

Press Release, April 21, 2014

Share this article

Follow Subsea World News

Events>

<< Mar 2015 >>
MTWTFSS
23 24 25 26 27 28 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

OMC 2015

OMC 2013 reached over 13,700 participants, an increase of 31% compared to 2011, from 32 countries worldwide, a sign that both the conference…

read more >

Transnational Oil, Gas and Energy Law

Study a Unique Online Learning Programme that is Highly Relevant to Today’s International Market…

read more >

Heavy Transport & Lifting for Oil, Gas and Marine by Richard Krabbendam

Building a lift plan
Choosing the right crane
Using a tail crane
Selecting the right platform trailer or SPMT
Estimating forces in lifting…

read more >

MCE Deepwater Development 2015

Marine, Construction & Engineering (MCE) Deepwater Development is recognized as the leading conference addressing technical issues related…

read more >