Ndurance Arrives at Gwynt y Môr OWF

Ndurance Arrives at Gwynt y Môr OWF

Ndurance, Boskalis’first ‘N Class’ cable-laying vessel, is expected to arrive at Gwynt y Môr Offshore Wind Farm site today.

The vessel will conduct cable laying operations in the eastern part of Gwynt y Môr.

The nearby vessels are required to observe a 500m safety zone around the Ndurance.

Gwynt y Môr OWF will consist of 160 turbines and it’s being built by RWE Innogy UK in Liverpool Bay, off the North Wales coast.

Once operational, Gwynt y Môr will have an installed capacity of 576MW, using Siemens 3.6MW turbines and generators. It will be capable of generating enough energy to meet the average annual energy needs of around 400,000 homes.

Subsea World News Staff, June 10, 2014; Image: Boskalis

Share this article

Follow Subsea World News

Events>

<< Apr 2015 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

SPE LONDON ANNUAL CONFERENCE MAXIMISING VALUE IN UPSTREAM OIL & GAS

The conference includes seven sessions with topics and themes encompassing the global and regional opportunities landscape and major factors…

read more >

Fundamentals of Subsea Integrity & Reliability

The course is delivered by distance learning so it does not disrupt your work or home life, and is an invaluable introduction to this vital…

read more >

Pipeline Engineering, Construction and Operations

Pipelines are generally the most economical way to transport large quantities of liquids and gases over land and below the sea, such as oil…

read more >

OGA 2015 – THE BIGGEST OIL AND GAS SHOW

The OGA series, The Region’s No 1 Oil and Gas Event is the biggest and most comprehensive event in the Asian region which hosts exhibitors…

read more >