Pacific Orca Completes SBJ Installation at Borkum Riffgrund 1 OWF

Pacific Orca Completes SBJ Installation at Borkum Riffgrund 1 OWF

The first offshore wind Suction Bucket Jacket (850 tons, 57m) has just been successfully installed on the DONG Energy Borkum Riffgrund 1 offshore wind farm.

The Borkum Riffgrund 1 offshore wind farm has been selected for testing this foundation due to its sandy seabed, which makes the installation of this concept a challenge. Challenging test conditions provide a more solid case for the evaluation of the concept.

The floating load out, transport and installation have been executed by GeoSea. The suction process has been done by SPT Offshore.

The installation vessel Pacific Orca, supplied by DONG Energy, is currently demobilizing in Eemshaven.

The armour stones will be installed soon by GeoSea’s sister company Tideway.

Related:

PHOTO: Innovative Suction Bucket Jacket Foundation Hits Seabed Off Germany

Press Release, August 29, 2014

Share this article

Follow Subsea World News

Events>

<< Apr 2015 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

Caspian Oil & Gas Conference

Attracting over 660 delegates and with official support from the Ministry of Industry and Energy and SOCAR, Caspian Oil & Gas is one of the…

read more >

Fundamentals of Offshore Field Development

The course delivers the detailed knowledge required, along with management strategies, for you to successfully engage in the sector…

read more >

Fundamentals of Subsea Integrity & Reliability

The course is delivered by distance learning so it does not disrupt your work or home life, and is an invaluable introduction to this vital…

read more >

Pipeline Engineering, Construction and Operations

Pipelines are generally the most economical way to transport large quantities of liquids and gases over land and below the sea, such as oil…

read more >