PHOTO: Normand Maximus Taking Shape

PHOTO Normand Maximus Taking ShapeThe BN 830 Normand Maximus was spotted during construction at Vard Tulcea and Contsanca in Romania.

The vessel is a VARD 3 19 design, developed by Vard Design in Ålesund. After the vessel’s hull is completed in Romania, the final outfitting of the vessel is scheduled for late 2015, at Vard Brattvaag in Norway.

Vard is building this offshore subsea construction vessel for the Norwegian vessel owner Solstad. The vessel will become the largest in the Solstad’s fleet of 46 wholly owned or partly owned vessels.

The vessel will be about 178 meters long, have a beam of 33 meters, a deck area of more than 2.500 m2 and will be able to accommodate 180 people.

Solstad has agreed with Italian contractor, Saipem, to charter the vessel for a minimum of 8 years from delivery, scheduled for 2Q 2016.

Subsea World News Staff; Image: Solstad

Share this article

Follow Subsea World News

Events>

<< Sep 2019 >>
MTWTFSS
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

Europort 2019

Europort, organised in the world port city of Rotterdam, will be the leading exhibition for special purpose vessels…

read more >

2019 SPE Annual Technical Conference and Exhibition (ATCE)

As one of the largest gatherings of E&P professionals, ATCE includes an extensive technical program covering…

read more >

Offshore Energy Exhibition & Conference 2019

Offshore Energy thematic sessions addressed the full life-cycle in the oil and gas and energy industry, starting with Exploration…

read more >

OCEANS 2019

OCEANS is the bi-annual event for global marine technologists, engineers, students…

read more >